How long does it take?

Time on site will vary according to the size of the building but between 9 and 17 working days is usually a good guide. A  proper installation, carried out in compliance with industry best-practice, involves several very important stages. These include erecting scaffolding, making preparatory repairs to the existing walls, removing exterior fittings, fixing the insulation boards, applying the various protective coats and finishing with the chosen render. Exterior fittings are then replaced as necessary and the whole site is cleaned up before hand-over.